Averages vary when it comes to building a tennis court, but it may cost you between $10,000 and $20,000. The average is around $14,400. Keep in mind that this applies to those who are doing it on their own. In some cases you might hire professionals to do the job instead of doing it yourself. If you hire a professional, the range can be anywhere from $8,000 to $16,000 or more.

Cost of Backyard Tennis Court

Cost to build tennis court

The cost of building a tennis court depends on the surface. For example, a clay court costs more than concrete and asphalt. The surface type will also determine whether you need to install lighting, irrigation, and other features.

Costs for Building Tennis Courts

The cost of building a tennis court can range from $10,000 – $30,000 depending on its size and surface material. Here are some examples:

Clay courts: $20 per square foot (including installation)

Concrete courts: $15 per square foot (including installation)

Asphalt courts: $10 per square foot (including installation)

13 Ways to Customize Your Backyard Tennis Court | Neave Sports

How much does it cost to build a tennis court

The cost of building a tennis court depends on many factors, including the size and location of your property, the materials you use, and whether or not you hire a contractor or do it yourself.

The average cost of building a tennis court ranges from $50 per square foot (including labor) to $150 per square foot. The total cost can range from $20,000 to $60,000 or more depending on how elaborate your design is. Here are some examples:

If you’re using concrete for your court surface, expect to pay about $30 per cubic yard for concrete mix and asphalt if needed. If you’re using brick pavers for your courtside surface instead, expect to pay about $15 per square foot for concrete mix and asphalt if needed.

If you’re doing most of the work yourself (or with friends), count on spending about 10-15 hours working on each square foot of court space in preparation for construction (grading the land and preparing subsoil) and another 10-15 hours during construction itself (laying down concrete).